Environmental Documents All Archives

Palm Desert Groundwater Replenishment Project - Notice of Determination stamped Palm Desert Groundwater Replenishment Project - Notice of Determination stamped
8/24/2018
Palm Desert Groundwater Replenishment Project -  Final EIR January 2018 Palm Desert Groundwater Replenishment Project - Final EIR January 2018
8/24/2018
Palm Desert Groundwater Replenishment Project - Final EIR Findings SOC January 2018 Palm Desert Groundwater Replenishment Project - Final EIR Findings SOC January 2018
8/24/2018
Final Program EIR Final Program EIR
2017-18 NPW Connections Project - Final Initial Study - Mitigated Negative Declaration 2017-18 NPW Connections Project - Final Initial Study - Mitigated Negative Declaration
2017-18 NPW Connections Project - Mitigation Monitoring and Reporting Program 2017-18 NPW Connections Project - Mitigation Monitoring and Reporting Program
NPW Connections Project - Notice of Intent to Adopt NPW Connections Project - Notice of Intent to Adopt
NPW Connections Project - Appendix C Biological Resources Assessment NPW Connections Project - Appendix C Biological Resources Assessment
NPW Connections Project - Appendix A CalEEMod NPW Connections Project - Appendix A CalEEMod
NPW Connections Project - Appendices CVWD 2017-18 Non-Potable Water Connections Project Draft IS-MND NPW Connections Project - Appendices CVWD 2017-18 Non-Potable Water Connections Project Draft IS-MND
CVWD 2017-18 NPW Connections Project Public Draft IS-MND 05142018 CVWD 2017-18 NPW Connections Project Public Draft IS-MND 05142018
NPW Connections Project - Appendix G Noise Measurement NPW Connections Project - Appendix G Noise Measurement
NPW Connections Project - Appendix F AB 52 Tribal Cultural Resources Consultation NPW Connections Project - Appendix F AB 52 Tribal Cultural Resources Consultation
NPW Connections Project - Appendix E Palentological Resources Letter Report NPW Connections Project - Appendix E Palentological Resources Letter Report
NPW Connections Project - Appendix D Cultural Resources Technical Report NPW Connections Project - Appendix D Cultural Resources Technical Report
Recirculated Draft EIR Notice of Availability Recirculated Draft EIR Notice of Availability
04/26/2018
Recirculated DPEIR Part 2 Recirculated DPEIR Part 2
04/26/2018
Recirculated DPEIR Part 1 Recirculated DPEIR Part 1
04/26/2018
Appendix E Energy Consumption Tables Appendix E Energy Consumption Tables
04/26/2018
Appendix D.3 Mecca-Northshore SMP Appendix D.3 Mecca-Northshore SMP
04/26/2018
Appendix D.2 Oasis-Valley Floor SMP Appendix D.2 Oasis-Valley Floor SMP
04/26/2018
Appendix D.1 Executive Report on the ECVSMP Appendix D.1 Executive Report on the ECVSMP
04/26/2018
Appendix C.2 Paleontological Resource Assessment Appendix C.2 Paleontological Resource Assessment
04/26/2018
Appendix C.1 Class I Cultural Resources Inventory Appendix C.1 Class I Cultural Resources Inventory
04/26/2018
Appendix B Air Quality and GHG Impact Analysis Appendix B Air Quality and GHG Impact Analysis
04/26/2018
Appendix A.3 Scoping Presentation, Sign-in Sheet, NOP Comment Letters Appendix A.3 Scoping Presentation, Sign-in Sheet, NOP Comment Letters
04/26/2018
Appendix A.2 NOP and Distribution List Appendix A.2 NOP and Distribution List
04/26/2018
Appendix A.1 Initial Study Appendix A.1 Initial Study
04/26/2018
Palm Desert Groundwater Replenishment Feasibility Study Palm Desert Groundwater Replenishment Feasibility Study
11/30/2017
PD Groundwater Replenishment NOC PD Groundwater Replenishment NOC
11/06/2017
PD Groundwater Replenishment NOA PD Groundwater Replenishment NOA
11/06/2017
Appendix E - NOP and Scoping Meeting Materials Appendix E - NOP and Scoping Meeting Materials
11/03/2017
Appendix D - Noise Modeling Results Appendix D - Noise Modeling Results
11/03/2017
Appendix C - Cultural Resources Report Appendix C - Cultural Resources Report
11/03/2017
Appendix B - Biological Resources Assessment Appendix B - Biological Resources Assessment
11/03/2017
Appendix A - Air Quality and CalEEMod worksheets Appendix A - Air Quality and CalEEMod worksheets
11/03/2017
Palm Desert Groundwater Replenishment Project - Draft EIR Palm Desert Groundwater Replenishment Project - Draft EIR
11/03/2017
Notice of Preparation and Public Scoping Meeting Notice of Preparation and Public Scoping Meeting
05/23/2017
Table of Contents Table of Contents
05/17/2017
Addendum No. 1 to the Initial Study / Mitigated Negative Declaration Addendum No. 1 to the Initial Study / Mitigated Negative Declaration
05/05/2017
Eastern Coachella Valley Stormwater Master Plan - Notice of Preparation Eastern Coachella Valley Stormwater Master Plan - Notice of Preparation
02/16/2017
Highway 86 Domestic Water Transmission Main Phase 2 and Pump Station - Initial Study/Mitigated Negat Highway 86 Domestic Water Transmission Main Phase 2 and Pump Station - Initial Study/Mitigated Negat
02/16/2017
Project Scoping Meeting - Thousand Palms Flood Control Project EIR/EIS Project Scoping Meeting - Thousand Palms Flood Control Project EIR/EIS
12/06/2016
Notice of Preparation/Notice of Intent & Notice of Public Scoping Meeting Notice of Preparation/Notice of Intent & Notice of Public Scoping Meeting
12/06/2016